Electricity generation from hydropower

The activity complies with either of the following criteria:

  1. the electricity generation facility is a run-of-river plant and does not have an artificial reservoir;
  2. the power density of the electricity generation facility is above 5 W/m2;
  3. the life-cycle GHG emissions from the generation of electricity from hydropower, are lower than 100gCO2e/kWh. The life-cycle GHG emissions are calculated using Recommendation 2013/179/EU or, alternatively, using ISO 14067:2018(162), ISO 14064-1:2018(163) or the G-res tool(164). Quantified life-cycle GHG emissions are verified by an independent third party.

 

Further information and explanations of the footnotes can be found on the EU Taxonomy website:

Link: Electricity generation from hydropower

Abschnitt A – Grundlagen der Exportkreditgarantien
I. Rechtliche Grundlagen
1. Verfassungsrechtliche Anforderungen
a) Gesetzesvorbehalt
b) Zuständigkeit des Bundes
ii) Verwaltungskompetenz
3. Frühere Mitwirkung der Bundesschuldenverwaltung bzw. Bundeswertpapierverwaltung
5. Verwaltungsverfahrensgesetz
6. Bundeshaushaltsordnung
Abschnitt B – Die einzelnen Absicherungsprodukte des Bundes (Deckungsformen)
I. Fabrikationsrisikodeckung
III. Forderungsdeckungen – Lieferantenkreditdeckung
IV. Forderungsdeckungen - Finanzkreditdeckung
1. Standard-Einzeldeckung
a) Systematische Einordnung der Finanzkreditdeckung und wirtschaftlicher/rechtlicher Hintergrund …
b) Das zu finanzierende Exportgeschäft
i) Förderungswürdigkeit
ii) Zahlungsbedingungen
d) Nicht deckungsfähige Parallelfinanzierung
3. Akkreditivbestätigungsdeckung als Variante der Finanzkreditdeckung
a) Hintergrund und Anwendungsbereich
b) Rechtliche Grundlagen/Konditionen
c) Verfahrenshinweise
Annex Klima-Check
C. EU Taxonomy