Supported projects

Published export transactions

Project information

If the contract value of a project exceeds EUR 15 million, basic project data are published after a final commitment for cover has been made provided that the exporter has given its consent. This information is brought up to date at the beginning of each month however with a time-lag of three months.

The order values are divided into the following categories:

  • Category 1: up to 15 million euros (no puplication)
  • Category 2: between 15 million euros and 50 million euros
  • Category 3: between 50 million euros and 100 million euros
  • Category 4: between 100 miooion euros and 200 million euros
  • Category 5: more than 200 million euros

 

Projects supported in previous years can be found in the projekt archive (German version only). 

List of officially supported projects 2023/24

as at October 2024
July 2024
Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Ancillary equipment for a board paper machine
Project location:./.
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:World Bank
Environmental, social and human rights issues:Occupational safety, water consumption, wastewater
Monitoring:No

 

Exporter: Nordex Energy SE & Co KG, Hamburg
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Expansion of a wind farm
Project location:./.
Category:3
Buyer's country:Türkiye
Credit period:8 years
Project category according to
Common Approaches:
B
International standards:World Bank
Environmental, social and human rights issues:Impact on birds and bats, shadow impact, resettlement
Monitoring:Yes

 

Exporter: GIM Export Group GmbH & Co KG, Göttingen
Financing institution:Commerzbank AG, Frankfurt
Project:Supply of machinery and equipment for the production of OSB boards
Project location:./.
Category:5
Buyer's country:United States
Credit period:8.5 years
Project category according to
Common Approaches:
B
International standards:World Bank
Environmental, social and human rights issues:Environmental impacts in the supply chain, air emissions, noise
Monitoring:No

 

Exporter: a German exporter
Financing institution:HSBC Bank Middle East Limited, Dubai (UAE), v.d. HSBC Continental Europe S.A., Germany, Düsseldorf in an open syndicate with ING Bank, a branch of ING-DiBa AG, Frankfurt am Main
Project:Turnkey construction of three wind farms
Project location:In the provinces of Malatya, Corum and Sivas
Category:4
Buyer's country:Türkiye
Credit period:14 years
Project category according to
Common Approaches:
B
International standards:World Bank
Environmental, social and human rights issues:Public health and safety, labor rights and occupational safety, biodiversity
Monitoring:Yes

 

Exporter: SMS group GmbH, Düsseldorf
Financing institution:./.
Project:Spare and change parts for profile and rail rolling mill
Project location:./.
Category:2
Buyer's country:Egypt
Credit period:near cash terms
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Equipment for the production of wood products
Project location:

- Kastamonu, 193 km north-east of Ankara (location A)

- Gebze, 49 km south-east of Istanbul (Site B)

- Reghin, Romania (Site C)

Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to
Common Approaches:
E
International standards:./.
Environmental, social and human rights issues:Occupational safety, timber supply chain
Monitoring:No
June 2024
Exporter: Brückner Maschinenbau GmbH, v.d. Brückner Group SE, Siegsdorf
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Line for the production of biaxially oriented polypropylene/polyethylene film (BOPP/BOPE film)
Project location:./.
Category:2
Buyer's country:India
Credit period:8 years
Project category according to
Common Approaches:
C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:No

 

Exporter: GE Grid GmbH, Berlin
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt am Main
Project:Solar power plants (photovoltaics)
Project location:Erzin / Hatay
Category:2
Buyer's country:Türkiye
Credit period:11 years
Project category according to
Common Approaches:
B
International standards:World Bank Safeguard Operational Policies
Environmental, social and human rights issues:Impact on biodiversity, supply chain, occupational safety
Monitoring:No

 

May 2024
Exporter: two German exporters
Financing institution:Banco Santander S.A., Boadilla del Monte
Project:Passenger cars and commercial vehicles
Project location:./.
Category:2
Buyer's country:Peru
Credit period:4 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Construction of a mobile gas pipeline
Project location:./.
Category:2
Buyer's country:Jordan
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:World Bank Safeguard Operational Policies (OP)
Environmental, social and human rights issues:Air emissions, occupational safety
Monitoring:No

 

Exporter: Brückner Maschinenbau GmbH, v.d. Brückner Group SE, Siegsdorf and Kampf GmbH, Wiehl
Financing institution:Oldenburgische Landesbank AG, Oldenburg
Project:Plant for the production of polypropylene films (BOPP) and cutting machines
Project location:Jammu
Category:2
Buyer's country:India
Credit period:10 years
Project category according to
Common Approaches:
C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:No

 

Exporter: Gauff GmbH & Co. Engineering KG, Nuremberg
Financing institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Construction of a long-distance water pipeline system with distribution centers (Quilonga Grande Lot 2, 6 and 7)
Project location:./.
Category:5
Buyer's country:Angola
Credit period:17 years
Project category according to
Common Approaches:
A
International standards:World Bank
Environmental, social and human rights issues:Resettlement, occupational safety, biodiversity, resource consumption
Monitoring:No

 

Exporter: one German exporter
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Supply of machinery for wood processing
Project location:./.
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to
Common Approaches:
B
International standards:World Bank Safeguard Operational Policies (OP)
Environmental, social and human rights issues:Timber supply chain, emissions, occupational safety and fundamental human rights
Monitoring:No

 

Exporter: Daimler Truck AG, Leinfelden-Echterdingen
Financing institution:ODDO BHF SE, Frankfurt
Project:Delivery of 221 trucks
Project location:./.
Category:2
Buyer's country:Egypt
Credit period:6 years
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: AMOVA GmbH, v.d. SMS group GmbH, Düsseldorf
Financing institution:./.
Project:Pallet transport system
Project location:./.
Category:2
Buyer's country:India
Credit period:near cash terms
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financing institution:./.
Project:2 paper machines
Project location:Nanning, Guangxi Autonomous Region
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financing institution:./.
Project:2 paper machines
Project location:Nanning, Guangxi Autonomous Region
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: GE Grid GmbH, Frankfurt
Financing institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Solar power plant (photovoltaics)
Project location:./.
Category:2
Buyer's country:Türkiye
Credit period:4.5 years
Project category according to
Common Approaches:
B
International standards:World Bank
Environmental, social and human rights issues:Impact on biodiversity, groundwater, supply chain, occupational safety
Monitoring:No
April 2024
Exporter: TGM Kanis Turbinen GmbH, Nürnberg
Financing institution:AKA Ausfuhrkredit-Gesellschaft mbH, Frankfurt
Project:Solar power system (photovoltaics)
Project location:Around 30 km southwest of the provincial capital Nigde
Category: 2
Buyer's country:Türkiye
Credit period:10 years
Project category according to 
Common Approaches:
E
International standards:./.
Environmental, social and human rights issues:Worker rights, biodiversity, solar supply chain
Monitoring:No

 

Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financing institution:./.
Project:Paper machine
Project location:Jining City/Yanzhou, province Shandong
Category: 2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to 
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: SMS group GmbH, Düsseldorf
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Stahl- und Hüttenwerke
Project location:Boden, Sweden
Category: 5
Buyer's country:Sweden
Credit period:9.5 years
Project category according to 
Common Approaches:
A
International standards:IFC Performance Standarts (PS), Weltbank
Environmental, social and human rights issues:Indigenous population, health and safety of the population, biodiversity
Monitoring:Yes

 

Exporter: thyssenkrupp nucera AG & Co. KGaA, Dortmund und

thyssenkrupp nucera Italy srl. Mailand

Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Plants for the production of organic chemicals
Project location:Boden, Sweden
Category: 5
Buyer's country:Sweden
Credit period:9.5 years
Project category according to 
Common Approaches:
A
International standards:IFC Performance Standarts (PS), Weltbank
Environmental, social and human rights issues:Indigenous population, health and safety of the population, biodiversity
Monitoring:Yes
March 2024
Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Norddeutsche Landesbank Girozentrale, Hannover
Project:264.0 MW onshore wind farm
Project location:Approx. 80 km south-east of Klaipeda
Category: 5
Buyer's country:Lithuania
Credit period:18 years
Project category according to 
Common Approaches:
B
International standards:Relevant World Bank/IFC Environmental, Health and Safety (EHS) Guidelines
Environmental, social and human rights issues:Work safety, effects on flora and fauna
Monitoring:No

 

Exporter: Airbus Helicopters Deutschland GmbH, Donauwörth
Financing institution:UniCredit Bank GmbH, München
Project:Three H 145 utility helicopters
Project location:nationwide
Category: 2
Buyer's country:Italy
Credit period:8 years
Project category according to 
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: BrauKon GmbH, Seeon
Financing institution:AKA Ausfuhrkredit-Gesellschaft mit beschränkter Haftung, Frankfurt
Project:Brewery plant
Project location:./.
Category: 2
Buyer's country:Cameroon
Credit period:10 years
Project category according to 
Common Approaches:
B
International standards:

World Bank Safeguard Operational Policies:

- OP 4.01 Environmental assessment

- OP 4.12 Involuntary resettlement

Environmental, social and human rights issues:Resettlements, waste water
Monitoring:No
February 2024
Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:Banco Santander, S.A., Boadilla del Monte
Project:Machines for the production of sweets
Project location:./.
Category: 2
Buyer's country:Brazil
Credit period:6 years
Project category according to 
Common Approaches:
E
International standards:./.
Environmental, social and human rights issues:Fundamental human rights, cocoa supply chain, wastewater, ambient air quality, sensitive area
Monitoring:No

 

Exporter: Herrenknecht Vertical GmbH, v.d. Herrenknecht AG, Schwanau
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Deep drilling rig
Project location:./.
Category: 2
Buyer's country:Brazil
Credit period:10 years
Project category according to 
Common Approaches:
E
International standards:./.
Environmental, social and human rights issues:Air emissions, occupational safety
Monitoring:No

 

Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Commerzbank AG, Frankfurt
Project:Expansion of a wind farm
Project location:Vize
Category: 2
Buyer's country:Türkiye
Credit period:10 years
Project category according to 
Common Approaches:
E
International standards:./.
Environmental, social and human rights issues:Effects on flora and fauna
Monitoring:No

 

Exporter: KRONES Aktiengesellschaft, Neutraubling
Financing institution:Bayerische Landesbank, München
Project:Pet filling systems
Project location:./.
Category: 2
Buyer's country:Tanzania
Credit period:7 years
Project category according to 
Common Approaches:
C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:No

 

Exporter: a German exporter
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a wind farm
Project location:Yalnizcamlar, approx. 8 km south-west of the town of Tatvan
Category: 2
Buyer's country:Türkiye
Credit period: 8 years
Project category according to 
Common Approaches:
B
International standards:World Bank Safeguard Operational Policies
Environmental, social and human rights issues:Shadow impact, effects on flora and fauna
Monitoring:No

 

Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financing institution:./.
Project:Paper machine
Project location:Approx. 19 km south-west of the town of Mostaganem
Category: 3
Buyer's country:Algeria
Credit period: near cash terms
Project category according to 
Common Approaches:
K
International standards:./.
Environmental, social and human rights issues:Waste water, occupational safety, supply chain, public health and safety
Monitoring:No

 

Exporter: SMS group GmbH, Düsseldorf
Financing institution:./.
Project:Casting/rolling plant
Project location:./.
Category: 5
Buyer's country:India
Credit period: near cash terms
Project category according to 
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.
January 2024
Exporter: Achenbach Buschhütten GmbH & Co. KG, Kreuztal
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Aluminium foil rolling line
Project location:./.
Category: 2
Buyer's country:India
Credit period: 10 years
Project category according to 
Common Approaches:
B
International standards:World Bank Safeguard Operational Policies (OP)
Environmental, social and human rights issues:Existing industrial area
Monitoring:no

 

Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Systems for the production of baked goods
Project location:./.
Category: 2
Buyer's country:Kenya
Credit period: 8.5 years
Project category according to 
Common Approaches:
C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: two German exporters
Financing institution:Natixis S.A., Paris
Project:Four OSB board plants and four drying plants
Project location:./.
Category: 3
Buyer's country:China, PR
Credit period: 9 years
Project category according to 
Common Approaches:
A
International standards:World Bank
Environmental, social and human rights issues:Timber supply chain, relocations
Monitoring:yes

 

Exporter: ACENDIS Healthcare GmbH, Hannover
Financing institution:ING Bank, eine Niederlassung der ING-DiBa AG, Frankfurt
Project:Hospital equipment
Project location:./.
Category: 2
Buyer's country:Türkiye
Credit period: 9 years
Project category according to 
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Air separation plant
Project location:./.
Category: 2
Buyer's country:Türkiye
Credit period: 10 years
Project category according to 
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Banco Santander S.A., Boadilla del Monte, Spanien
Project:Chlorine alkali electrolysers
Project location:./.
Category: 2
Buyer's country:Brazil
Credit period: 10 years
Project category according to 
Common Approaches:
./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.
December 2023
Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Maintenance of an existing methanol plant
Project location:./.
Category: 4
Buyer's country:Oman
Credit period: 10 years
Project category according to
Common Approaches:
E
International standards:./.
Environmental, social and human rights issues:Impact on a protected area
Monitoring:no

 

Exporter: a German exporter
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Plant for the production of polyester films (BOPET)
Project location:./.
Category: 2
Buyer's country:Colombia/Peru
Credit period:8.5 years
Project category according to 
Common Approaches:
E
Internationale standards:./.
Environmental, social and human rights issues:Air emissions, resource efficiency, occupational safety
Monitoring:no

 

Exporter: Uhde High Pressure Technologies GmbH, v.d. thyssenkrupp

Uhde GmbH, Dortmund

Financing institution:./.
Project:Production plant for plastic granulate (EVAC)
Project location:Guangxi
Category: 2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to 
Common Approaches:
./.
Internationale standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:DZ BANK Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:BOPET production line
Project location:./.
Category: 2
Buyer's country:China, PR
Credit period:10 years
Project category according to 
Common Approaches:
B
Internationale standards:IFC Performance Standards (PS)
Environmental, social and human rights issues:Raw material production at the site, air emissions, labour rights
Monitoring:no

 

Exporter: Brückner Maschinenbau GmbH, Siegsdorf
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Plant for the production of polypropylene films (BOPP) including recycling system
Project location:./.
Category: 2
Buyer's country:Colombia/Peru
Credit period:8.5 years
Project category according to 
Common Approaches:
E
Internationale standards:./.
Environmental, social and human rights issues:Air emissions, resource efficiency, occupational safety
Monitoring:no

 

November 2023
Exporter: a German exporter
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Crawler crane
Category:2
Buyer's country:United States
Credit period:8 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: Rieckermann GmbH, Hamburg
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Textile machinery
Category:2
Buyer's country:Bangladesh
Credit period:10 years
Project category according to Common Approaches:B
International standards:World Bank/IFC Invironmental, Health and Safety (EHS) Guidelines
Environmental, social and human rights issues:Air emissions, waste water, occupational safety and working conditions
Monitoring:No

 

Exporter: a German exporter
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Air separation plant
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches:C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:No

 

Exporter: a German exporter
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Expansion of a wind farm
Category:3
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches:B
International standards:

Relevant World Bank/IFC Environmental, Health and Safety (EHS) Guidelines

- General Guidelines

- Guidelines for Wind Energy

Environmental, social and human rights issues:Biodiversity, labour rights and occupational safety
Monitoring:Yes

 

Exporter: a German exporter
Financing institution:Bayerische Landesbank, München
Project:Construction of a wind farm
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches:B
International standards:World Bank Safeguard Operational Policies (OP)
Environmental, social and human rights issues:Impact on flora and fauna, impact on the local population, occupational safety
Monitoring:No
October 2023
Exporter: Trützschler Group SE, Mönchengladbach
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Textile machines
Category:2
Buyer's country:Uzbekistan
Credit period:8 years
Project category according to Common Approaches:B
International standards:Weltbank Safeguard Operational Policies
Environmental, social and human rights issues:Supply chain, occupational safety, working conditions
Monitoring:No

 

Exporter: Brückner Maschinenbau GmbH, v.d. Brückner Group SE, Siegsdorf
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:BOPET plant
Category:2
Buyer's country:Indonesia
Credit period:10 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Bayerische Landesbank, München
Project:Expansion of a wind farm
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches:B
International standards:

General Guidelines

Guidelines for Wind Energy

Environmental, social and human rights issues:Impact on avifauna, expropriations
Monitoring:No

 

Exporter: SMS group GmbH, Düsseldorf
Financing institution:./.
Project:Rail rolling mill
Category:3
Buyer's country:Italy
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: Brückner Maschinenbau GmbH, Siegsdorf
Financing institution:./.
Project:BOPP film production line
Category:2
Buyer's country:Pakistan
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.
September 2023
Exporter: Brückner Maschinenbau GmbH, Siegsdorf
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Plant for the production of polypropylene films (BOPP)
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches:C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: MAN Energy Solutions SE, Augsburg, and another German Exporter
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:2 air compressor lines and 2 agitators
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches:B
International standards:IFC Performance Standards (PS)
Environmental, social and human rights issues:Occupational safety, air emissions, waste water
Monitoring:No

 

Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financing institution:Bayerische Landesbank, München
Project:Machines and systems for the production of laminate and compact board
Category:3
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: GIM Export Group GmbH & Co. KG, Göttingen
Financing institution:Commerzbank AG, Frankfurt
Project:Supply of machinery and equipment for the finishing of wood-based panels
Category:3
Buyer's country:Luxembourg
Credit period:8.5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Commerzbank AG, Frankfurt
Project:a nonwovens line
Category:2
Buyer's country:Sweden
Credit period:8.5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: NEPTUN WERFT GmbH & Co. KG, Rostock
Financing institution:KfW IPEX-Bank GmbH, Frankfurt (consortium leader)
Project:Construction and delivery of 5 river cruise ships
Category:4
Buyer's country:Switzerland/Bermuda
Credit period:8.5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: Euromix MTP GmbH, Porta Westfalica
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Construction vehicles
Category:2
Buyer's country:Dubai, UAE
Credit period:6 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: J.M. Voith SE & Co. KG, Heidenheim
Financing institution:./.
Project:Paper machine
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: NEPTUN WERFT GmbH & Co. KG, Rostock
Financing institution:KfW IPEX-Bank GmbH, Frankfurt (Konsortialführer)
Project:Construction and delivery of 5 river cruise ships
Category:4
Buyer's country:Switzerland/Bermuda
Credit period:8.5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.
August 2023
Exporter: Dieffenbacher GmbH, Eppingen
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Production line for the manufacture of MDF boards
Category:3
Buyer's country:Brasil
Credit period:10 years
Project category according to Common Approaches:B
International standards:Worldbank
Environmental, social and human rights issues:Wood supply chain, emissions
Monitoring:no

 

Exporter: SMS group GmbH, Düsseldorf
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Construction of a steelworks
Category:4
Buyer's country:United States
Credit period:5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: Jebsen & Jessen Industrial Solutions GmbH, Hamburg
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Machines for the production of packaging
Category:2
Buyer's country:Umm Al Quwain, UAE, Abu Dhabi, UAE, Dubai, UAE
Credit period:10 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Citibank N.A., London Branch, v.d. Citibank Europe plc., Germany Branch, Frankfurt
Project:Delivery of 680 trucks
Category:3
Buyer's country:Lithuania
Credit period:5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: a German exporter
Financing institution:Citibank N.A., London Branch, v.d. Citibank Europe plc., Germany Branch, Frankfurt
Project:600 trucks
Category:2
Buyer's country:Lithuania
Credit period:5 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.

 

Exporter: PROMAN Gesellschaft für Projektmanagement mbH, Düsseldorf
Financing institution:KfW IPEX-Bank GmbH, Frankfurt am Main
Project:Ammonia plant
Category:5
Buyer's country:Mexico
Credit period:12.5 years
Project category according to Common Approaches:A
International standards:IFC Performance Standards
Environmental, social and human rights issues:Preservation of biodiversity, emissions, waste water
Monitoring:Yes

 

Exporter: Uhde Inventa-Fischer GmbH, Berlin
Financing institution:./.
Project:Production plant for the manufacture of lactide
Category:2
Buyer's country:China, PR
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.
July 2023
Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Bayerische Landesbank, Munich
Project:Construction of a wind farm
Category:2
Buyer's country:Türkiye
Credit period:7 years
Project category according to Common Approaches:B
International standards:World Bank
Environmental, social and human rights issues:Impact on the avifauna, expropriations
Monitoring:No

 

Exporter: Dieffenbacher GmbH Maschinen- und Anlagenbau, Eppingen
Financing Institution:Landesbank Baden-Württemberg, Stuttgart
Project:Production line for medium-density fibreboard
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches:E
Internation standards:./.
Environmental, social and human rights issues:Labour rights and occupational health and safety, raw material supplies, resource efficiency, air emissions
Monitoring:No

 

Exporter: Voith Hydro GmbH & Co. KG, Heidenheim
Financing institution:Banking consortium led by UniCredit Bank AG, Munich
Project:Construction of the hydroelectric power plant Caculo Cabaca
Category:5
Buyer's country:Angola
Credit period:18 years
Project category according to Common Approaches:A
International standards:IFC Performance Standards (PS), Weltbank Safeguard Operational Policies (OP), World Commission on Dams (WCD)
Environmental, social and human rights issues:Biodiversity, working conditions, workers' rights and waste water
Monitoring:Yes

 

Exporter: KRONES Aktiengesellschaft, Neutraubling
Financing institution:Bayerische Landesbank, München
Project:Installations for the Production and Filling of Beverages
Category:2
Buyer's country:Saudi Arabia
Credit period:10 years
Project category according to Common Approaches:C
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:No

 

Exporter: Steelwind Nordenham GmbH, Nordenham
Financing institution:KfW IPEX-Bank GmbH, Frankfurt am Main
Project:Construction of a wind farm
Category:5
Buyer's country:Poland
Credit period:20 years
Project category according to Common Approaches:./.
International standards:./.
Environmental, social and human rights issues:./.
Monitoring:./.
June 2023
Exporter: Siemens Mobility GmbH, Erlangen
Financing institution:Banco Santander S.A., Boadilla del Monte
Project:High-speed railway line "Green Line"
Category:5
Buyer's country:Egypt
Credit period:up to 14 years
Project category according to Common Approaches: A
International standards:IFC performance standards (PS)
Enviromental, social and human rights issues:Environmental and social management, resettlement, cultural assets, 
biodiversity, occupational safety
Monitoring: no

 

Exporter: Jebsen & Jessen Industiral Solutions GmbH, Hamburg
Financing institution:Standard Chartered Bank AG, Frankfurt
Project:Textile machines
Category:3
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches:B
International standards:World Bank/IFC Environmental, Health and Safety (EHS) Guidelines as well as IFC Performance Standards
Environmental, social and human rights issues:Occupational health and safety, air emissions, waste water
Monitoring:no

 

Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:Plant for the production of polypropylene foil (BOPP)
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches: C
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Bayerische Landesbank, München
Project:Construction of wind power stations
Category:2
Buyer's country:Türkiye
Credit period:12 years
Project category according to Common Approaches: B
International standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Biodiversity, land expropriation
Monitoring: no

 

Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Bayerische Landesbank, München
Project:Expansion of an existing wind farm
Category:2
Buyer's country:Türkiye
Credit period:8 years
Project category according to Common Approaches: B
International standards:World Bank
Enviromental, social and human rights issues:Impact on the avifauna, expropriations
Monitoring: no

 

Exporter: a German exporter
Financing institution:ING Bank, a branch of ING-DiBa AG, Frankfurt
Project:Lorry trailers
Category:4
Buyer's country:Lithuania
Credit period:5 years
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: MCA Deutschland GmbH, Eschborn
Financing institution:Groups of banks led by Commerzbank AG, Frankfurt am Main
Project:Complete solution for the sustainable electrification of 60 villages
Category:5
Buyer's country:Angola
Credit period:18 years
Project category according to Common Approaches: B
International standards:IFC Performance Standards (PS) / World Bank
Enviromental, social and human rights issues:Economic resettlements, sensitive areas, supply chain
Monitoring: yes
May 2023
Exporter: BMA Braunschweigische Maschinenbauanstalt AG, Braunschweig
Financing institution:Deutsche Bank AG, Frankfurt
Project:Sugar refinery
Category:3
Buyer's country:Angola
Credit period:10 years
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: a German exporter
Financing institution:KfW IPEX-Bank GmbH, Frankfurt
Project:Electrolysis modules
Category:5
Buyer's country:Saudi Arabia
Credit period:13.5 years
Project category according to Common Approaches: A
International standards:IFC Performance Standards
Enviromental, social and human rights issues:Resettlements, biodiversity, labour rights
Monitoring: yes

 

Exporter: Siemens Logistics GmbH, Nürnberg
Financing institution:./.
Project:Modernisation of a baggage handling system
Category:4
Buyer's country:Malaysia
Credit period:4 years
Project category according to Common Approaches: E
International standards:./.
Enviromental, social and human rights issues:Waste, protected areas
Monitoring: no

 

Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Bayerische Landesbank, München
Project:Construction of a wind farm
Category:2
Buyer's country:Türkiye
Credit period:14 years
Project category according to Common Approaches: A
International standards:IFC Performance Standards (PS), Weltbank
Enviromental, social and human rights issues:Biodiversity
Monitoring: yes

 

Exporter: Textima Export Import GmbH, Berlin
Financing institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Fertilizer production plant
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches: A
International standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Consumption of resources and energy, air emissions, occupational health and plant safety
Monitoring: no

 

Exporter: Oerlikon Textile GmbH & Co. KG, Remscheid
Financing institution:Landesbank Baden-Württemberg, Stuttgart
Project:10 Spinning machines and winders as well as a polycondensation plant 
Category:2
Buyer's country:India
Credit period:8 years
Project category according to Common Approaches: B
International standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Waste water, emissions, hazardous substances
Monitoring: no

 

Exporter: Brückner Maschinenbau GmbH, v.d. Brückner Group SE, Siegsdorf
Financing institution:./.
Project:BOPET foil production plant
Category:2
Buyer's country:Pakistan
Credit period:near cash terms
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: a German exporter
Financing institution:ING Bank a branch of ING-DiBa AG, Frankfurt
Project:Delivery of 300 trucks
Category:2
Buyer's country:Lithuania
Credit period:5 years
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.
April 2023
Exporter: Nordex Energy SE & Co. KG, Hamburg
Financing institution:Bayerische Landesbank, Munich
Project:Construction of a wind farm
Category:2
Buyer's country:Türkiye
Credit period:14 years
Project category according to Common Approaches: A
International standards:IFC Performance Standards (PS), World Bank
Enviromental, social and human rights issues:   Biodiversity, expropriations
Monitoring: yes

 

Exporter: a German exporter
Financing institution:Kommunalkredit Austria AG, Vienna
Project:Construction of a wind farm
Category:3
Buyer's country:Finland
Credit period:18 years
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring: ./.

 

Exporter: a German exporter
Financing institution:Kommunalkredit Austria AG, Vienna
Project:Construction of a wind farm
Category:2
Buyer's country:Finland
Credit period:18 years
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring: ./.

 

Exporter: a German exporter
Financing institution:Kommunalkredit Austria AG, Vienna
Project:Construction of a wind farm
Category:2
Buyer's country:Finland
Credit period:18 years
Project category according to Common Approaches: ./.
International standards:./.
Enviromental, social and human rights issues:   ./.
Monitoring: ./.

 

Exporter: a German exporter
Financing institution:Landesbank Hessen-Thyringen Girozentrale, Frankfurt
Project:Delivery of components for two ABS systems
Category:3
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches: B
International standards:IFC Performance Standards (PS)
Enviromental, social and human rights issues:   Labour rights
Monitoring: yes
March 2023
Exporter: Outotec GmbH & Co. KG, Oberursel
Financial institution:Landesbank Hessen-Thüringen, Frankfurt
Project:Gas purifying and sulphuric acid plants for a zinc smelting plant
Category:3
Buyer's country:Uzbekistan
Credit period:10 years
Project category according to Common Approaches:E
International standards:./.
Enviromental, social and human rights issues:Air emissions
Monitoring: no

 

Exporter: a German exporter
Financial institution:Commerzbank AG, Frankfurt
Project:Plant for the production of biaxially oriented polypropylene films (BOPP)
Category:2
Buyer's country:Türkiye
Credit period:10 years
Project category according to Common Approaches:C
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: no

 

Exporter: Tadano Demag GmbH, Zweibrücken
Financial institution:ODDO BHF SE, Frankfurt
Project:Lattice boom crawler cranes and all terrain mobile cranes
Category:2
Buyer's country:Cyprus/Belgium/Abu Dhabi, UAE
Credit period:8 years
Project category according to Common Approaches:./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: TGM Kanis Turbinen GmbH, Nürnberg
Financial institution:ODDO BHF SE, Frankfurt
Project:Solar power plant
Category:2
Buyer's country:Türkiye
Credit period:9 years
Project category according to Common Approaches:B
International standards:World Bank Safeguard Operational Policies (OP)
Enviromental, social and human rights issues:Occupational health and safety, biodiversity impact, expropriations
Monitoring: yes

 

Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Modernisation of a hot strip mill
Category:2
Buyer's country:India
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Hot strip mill
Category:4
Buyer's country:India
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

Exporter: SMS group GmbH, Düsseldorf
Financial institution:./.
Project:Basic oxygene steelmaking plant
Category:2
Buyer's country:India
Credit period:near cash terms
Project category according to Common Approaches:./.
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: ./.

 

February 2023
Exporter: Brückner Maschinenbau GmbH & Co. KG, Siegsdorf
Financial institution:Landesbank Baden-Württemberg, Stuttgart
Project:BOPP production plant
Category:2
Buyer's country:India
Credit period:10 years
Project category according to Common Approaches:C
International standards:./.
Enviromental, social and human rights issues:./.
Monitoring: no

 

Exporter: a German exporter
Financial institution:DZ BANK AG Deutsche Zentral-Genossenschaftsbank, Frankfurt
Project:Polymerisation plant
Category:2
Buyer's country:China, PR
Credit period:10 years
Project category according to Common Approaches:A
International standards:IFC-Performance Standards (PS), World Bank
Enviromental, social and human rights issues:Resettlements, labour standards, waste water, air emissions
Monitoring: yes